Skip to content
Lambert Consulting

Artificial Intelligence: A Cross-Functional Offering

Results first. Infrastructure second.

An assistant for your documents, end-of-line verification, a platform for multiple services. Where artificial intelligence is applied is determined by your data, not by a catalog.

See all solutions
4Comparing Architectures, Criterion by Criterion
2 fieldsSoftware and hardware under one roof
All Use CasesUse cases first, technology last

Our first department

This is what needs to work every morning.

Your servers, your workstations, your phone systems, and your identities. The foundation that no one notices as long as it holds, but that everyone notices the day it fails.

View the department
Multi-siteNational and international projects
3Branches in French-speaking Switzerland
View our client projectsCase Studies and References
Let us know how you're doingGetting a quote is free

How We Work

A piece of advice, not a sales pitch.

Our approach is consultative: we tell you what we think, even when it’s not in our best interest. That’s what makes projects succeed.

About Us
1995First project, using Microsoft SMS
Family-orientedOn a human scale and sustainable

Our Branches

Vaud, headquarters9 Avenue des Baumettes, 1020 Renens+41 21 806 37 15
Valais134 Oscar-Bider Street, 1950 Sion+41 27 552 00 22
FribourgChemin de Montmoirin 18a, 1618 Châtel-Saint-Denis+41 26 322 59 05
Monday through Friday8:00 a.m. – 6:00 p.m.
Contact UsFirst 30-minute consultation, with no obligation

Azure Migrate: The Classic Experience Will Close on September 30, 2026

Organizations that migrate from VMware or physical machines to Azure agent-based replication have until September 30, 2026, to complete the migration. After that date, the standardAzure Migrate will be discontinued: no more migration, no failover, and no visibility into the machines that have remained on it via the portal Azure.

Publication Date
4 minReading time
Azure and infrastructureBlog post

Two of the three dates on the schedule have already passed, and that's what makes the situation less comfortable than it seems.

Timeline of the three dates for the withdrawal of the classicAzure Migrate: March 31, May 31, and September 30, 2026
Only the third date closes the door for good.

The schedule, and what's already behind us

DateWhat Comes to an End
March 31, 2026No new replications can be started from the classic appliance. Existing replications continue.
May 31, 2026Replication support ends with the classic experience. Migrations of existing replicas are still possible, but you can no longer modify them or start new ones.
September 30, 2026Complete removal. No more views, no more management, and no more replication or migration on these machines via the portal.

An organization that initiated replication before March 31 and has not yet switched over is therefore in a tight spot: it can still migrate, but it can no longer make any adjustments. If the replication configuration is not suitable, the only option is to go back through the new appliance.

What the simplified experience replaces

The simplified experience isn't just window dressing: it's a stack of migration with an agent, rebuilt for physical and VMware environments. Microsoft highlights four key differences that matter in day-to-day operations.

The replication appliance runs on Windows Server 2022, whereas the classic version was based on an older version. That’s the key to making the rest work.

Support for operating systems has been expanded, particularly for recent Linux distributions. A unified matrix replaces the separate tables—which greatly simplifies the verification phase, even before migration.

Updates are now automatic for both the mobility agent and the appliance. In the classic version, both components had to be updated manually—and that’s typically something people forget to do on an appliance set up for a three-month project.

Integration requires about half as many configuration steps. For a project involving several dozen machines, that’s no small matter.

One thing you shouldn't miss: new features, security fixes, and support for new Linux distributions are only available in the simplified experience. The classic version is no longer being updated.

Who Is Actually Affected?

Not everyone, and it's worth pointing that out before triggering an unnecessary alert.

Agent-based replication applies to physical servers, virtual machines VMware s migrated in agent mode, and machines in other environments treated as physical. The migration VMware Agentless replication, on the other hand, uses the same appliance as discovery and assessment and does not rely on the traditional replication appliance. The migration Hyper-V replication involves agents installed on the host and follows a different path.

In other words: if your project migration uses the replication appliance, this applies to you. If it relies on agentless discovery, it does not.

The question to ask the team managing the project is therefore specific: Which appliance is deployed, and which machines are still replicating through it? Even a vague answer is still an answer.

What to Do, Depending on the Situation

migration s completed, but the appliance is still in place. There’s no rush on the Azure, but the appliance is a machine that consumes resources and holds credentials. It should be removed.

A replication is currently in progress, with the switchover scheduled before the end of September. It’s feasible as is, without a transition period. But lock in the configuration: it can no longer be modified, and discovering the need for an adjustment in September leaves little room for maneuver.

A replication is currently in progress; the switchover will take place after September. We need to transition to the simplified appliance. This is not an update to the existing system: it is a new appliance that needs to be deployed, and the replications need to be restarted.

migration ation has not yet begun. There’s no question about it: the legacy appliance has not accepted any new replicas since March.

In the last three cases, the real constraint isn’t technical—it’s time-related. An initial replication of a large volume takes days, application validation takes several more, and the switchover windows must be negotiated with the business units. Think in terms of weeks, not days.

This type of trade-off between a static platform and a dynamic one comes up regularly in infrastructure projects; we also address it from the perspective of connected local hosting in our article on Azure Local.

Microsoft Sources

After reading

What an article Can't Know

An article describes what applies to everyone. What varies from one organization to another is the inventory: which applications, which accounts, and which pieces of equipment are actually involved in your organization. The inventory determines the scope of the effort, and it cannot be summarized on a single page.

You'll be speaking directly with the engineers who will be doing the work, not with a middleman. We'll respond within 24 business hours.

If the topic has changed

Check what is still true

Announced dates are sometimes postponed, products are renamed, and conditions change. The blog tracks these topics over time: when a rule changes, a new post announces it.